Close the residual gaps the 2026-09-18 audit left open
Re-checked every item of the audit's own outcome section against the tree.
Most held, but five items marked fixed had residual gaps — one of them a
live IDOR — and the deferred list was untouched.
Security:
- Analytics IDOR: /api/analytics/{ws}/overview and /projection took
child_id as an unchecked query param, and get_overview called
get_days_left_at_age_4 without workspace_id, so the ownership guard
never ran. Any member could read another workspace's child projection.
Fixed at both layers.
- Scraper: session ids no longer logged at INFO; a persist-callback
failure's raw exception text and the FK maintenance banner's scraped
text no longer reach the poll client.
- Email is now case-normalised at the API boundary, with migration 009
lowercasing existing rows (aborts naming colliding rows rather than
failing opaquely on the UNIQUE constraint).
Frontend correctness:
- usePlanProposal/usePlanSync gained the stale-response guard the other
hooks already had.
- PlanSyncProvider no longer fires POST /plan/sync before auth resolves
off a blindly-read localStorage workspaceId.
- Busy flags are cleared unconditionally across all 16 useLatestRequest
consumers. setBusy(true) was unconditional while the clear was guarded
by isCurrent, so a superseded call stranded its flag forever — under
StrictMode this hung every in-app navigation behind the PageSkeleton.
isCurrent decides which response's data wins, never whether a call
releases the flag it raised.
Performance:
- Calendar no longer blanks on a mutation, and a multi-day save issues N
writes plus one background refetch instead of 2N requests.
- take_pl_on_red_days moved onto GET /auth/context, dropping a redundant
GET /workspace/:id from every cold load.
CI and repo hygiene: least-privilege permissions block, actions pinned to
commit SHAs, npm ci, uv sync --locked, failure-only artifact upload,
dependabot; dead frontend/out.js removed; CSP added to the nginx template
(repeated into the location blocks that set their own add_header, since
nginx does not merge them across levels).
Left deferred by decision: refresh-token revocation, the phase-2 contract
change, M4, M5, L2, and H12's cross-route cache. Details and the smaller
follow-ups browser verification turned up are in the audit report.
Backend 901 passed, coverage 92%. Frontend 1322 tests, coverage
98.17/94.79/92.14/98.17.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PngVF38MLpdkgXcByKfdW6
This commit is contained in:
@@ -42,7 +42,12 @@ export function useDayOverrides(workspaceId: string): UseDayOverridesResult {
|
||||
if (!isCurrent(requestId)) return
|
||||
setError(err instanceof Error ? err.message : 'Failed to load day overrides')
|
||||
} finally {
|
||||
if (isCurrent(requestId)) setBusy(false)
|
||||
// Unguarded: `isCurrent` decides which response's DATA wins, not
|
||||
// whether a superseded call's own busy flag gets cleared — a stale
|
||||
// call must still release the flag IT raised, or it can strand
|
||||
// that flag true forever (see usePlannedDays.ts for the hang this
|
||||
// exact guard caused there).
|
||||
setBusy(false)
|
||||
}
|
||||
},
|
||||
[workspaceId, start, isCurrent],
|
||||
|
||||
Reference in New Issue
Block a user