jacobh2 782415122d Separate user intent from planner output via day assertions
The calendar mixed two kinds of truth in one table. `planned_leave_day` was
simultaneously the allocator's output cache, the user's override store
(`is_pinned`, plus ad-hoc rows with no `wish_id`), and the resource ledger that
analytics and the age-4 maths read. The planner therefore had to ask "am I
allowed to touch this row?" on every sync, and got it wrong at the edges.

Every user assertion is now one `day_assertion` row — a concrete `day_type`
replaces a pinned day, a row with no `wish_id` replaces an ad-hoc day, and
`day_type='none'` replaces `planned_day_exclusion`. `planned_leave_day` becomes
purely derived with a single writer, and `PlanningService.pinned_keys()` is the
single answer to "is this day pinned", used by the allocator's loader, by
`sync_plan` and by the read router alike.

On top of that, every calendar band is now a real event: an ad-hoc band opens
the same full editor as a wish-backed one and saving it promotes it to a
`LeaveWish`, so it can be named, repeated yearly, assigned to either or both
parents, and handed to the planner. "Planering" is a `moveable` toggle plus a
from/to month bound plus a separate lock/unlock action on the days themselves,
replacing a three-rung ladder whose "planner decides" rung set a search window
equal to the drawn dates and so could never move anything.

Bugs found and fixed along the way:

- The plan erased its own history. Fixed windows clip to today, so an elapsed
  auto-placed day fell into `stale_keys` and was deleted on the next sync —
  and a background sync runs on every workspace load. Past rows are now frozen
  and counted as spent.
- Migration 010's downgrade silently destroyed every pinned day and exclusion
  (`is_pinned` returned as DEFAULT 0, the exclusion table came back empty,
  exit 0, no warning). It now reconstructs both from `day_assertion`, and 009
  itemises what it cannot recover before dropping the table.
- Deleting a period left its assertions behind, locking those dates forever
  with no UI path to clear them. Wish deletion now clears them by `wish_id`.
- `DayAssertionService` and `LeaveWishService` committed multi-statement writes
  without a transaction; a crash mid-write diverged the tables or half-deleted
  a series. Both now run in a unit of work.
- A sibling year's shortfall was never surfaced: the toast only inspected the
  edited occurrence's outcome, so a fully unfunded later year rendered as an
  empty band with no warning.
- A flexible window whose bound had entirely elapsed was dropped from the
  proposal with no outcome at all. It now reports as `unplaced`.
- Unlocking a period deleted its days instead of returning them to the planner.
- The e2e global setup posted to a route deleted in this change, which would
  have failed the whole suite before its first test.

Gates: backend 938 tests / 91% coverage, frontend 1351 / 97.4 | 92.2 | 94.37 |
97.4. Migrations 009 and 010 audited against a hand-built realistic database:
the upgrade reconciles exactly and a constraint violation fails safe, leaving
the schema at 008.

Not complete. Step 4's toggle, month picker and lock/unlock action are verified
by browser walk and unit tests, but the partial-lock readout was not exercised.
`ideas.md` §7 adds a full plan for the vacation-forfeiture defect (the planner
detects expiring days and then does nothing about them) — not implemented here.
Remaining smaller items are listed in the session's restructure notes.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01T4wjgbVL4HAC5Rdaw75VbV
2026-09-21 07:20:14 +02:00
jacobh2 ad0e3c0b33 Keep a repeating week on its weekday when the planner picks the dates
A yearly-repeating period kept the same calendar date instead of the same
weekday: 2026-10-05..10-11 (Mon-Sun) recurred as 2027-10-05..10-11 (Tue-Mon)
rather than 2027-10-04..10-10. The snap added in 224fe7a only ever covered
window_mode == 'fixed'; 'flexible' wishes were unaligned at both stages.

project_window now snaps both modes. A flexible bound is still a bounding
range, but it keeps its weekday alignment year over year with its span held
fixed, so the search space never shrinks and a bound that is exactly as long
as the target (its only candidate) repeats week-shaped.

_rank_candidate gains a Monday-start term between cost and start, so equal-cost
candidates break on week alignment instead of "earliest". It sits after cost
deliberately: a cheaper non-Monday start still wins, because red days outrank
alignment.

_reuse_already_funded_window would otherwise freeze a pre-existing misaligned
placement forever, so it now releases a year whose reuse winner is misaligned
when a fresh search ranks strictly better -- never when one of its days is
pinned or excluded, so a deliberate per-day override always survives.

Migration 008 realigns flexible series already materialised under the old rule;
projection runs once, at create/update, so nothing repairs them on read.

Alongside this, the planner now says when it moved a period to catch red days.
WindowOutcome carries shift_gain_days (the saving over the naive bound-start
placement) and the calendar toasts it, once, on the sync that decided it.
A fixed window is never auto-moved -- its "exact requested placement,
unconditionally" guarantee stands -- but its shift suggestion is no longer
hidden behind a shortfall, so a fully-funded one can surface a cheaper week too.

Editing a period in the popover now also sends window_mode: 'fixed' with a
matching target. Preset chips create flexible wishes; dragging one down to an
exact week left it flexible with a week-long bound, which is the degenerate
single-candidate case that produced the reported dates.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01DXPBfr1v7F71t6QcbHCaaT
2026-09-20 12:04:20 +02:00
jacobh2 8cfb9c82c6 Let a day removed from a period stay removed
Taking one day out of a period the planner placed did nothing that
lasted: the period still asked for a full week, so the next sync put the
day straight back. The option was disabled rather than lying about it.

A removed day is now recorded as its own thing — no leave for this
parent, this child, this date — and the planner honours it on every
later sync. It is kept apart from the working-day overrides, which
answer a different question about the calendar rather than about the
plan.

The day belongs to the parent whose band was clicked, so removing one
parent's day leaves their partner's alone; where both parents were to be
off on one funding arrangement, the partner is simply funded on their
own instead. A removed day shortens what the period is asking for rather
than counting as a day the plan failed to find, so the advice about
closing a shortfall does not start arguing for a day nobody wants.

Nothing is removed without a way back: the toast undoes it, and the day
itself is marked in the calendar and offers to restore.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ei7gCZzdd751uZtPzb1Pep
2026-09-19 16:05:17 +02:00