Files
F-r-ldraledigplannerare/todo.md
T
jacobh2 6904961bb4 Sort the loose planning notes into folders
Reference notes move to information/, unstarted feature write-ups to
new-features/, so the repo root stops being a pile of markdown.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-20 11:21:21 +02:00

1.4 KiB

  • Bug in the planning when it repeats yearly: It is taking the exact same dates, but the way you usually take time off is week based, so 5th-11th of october 2026 is a monday through sunday, but for 2027 it looks like I'll take time off from tuesday to the following week's monday, which is not what I will do. Instead for 2027 I will probably take 4th to 10th instead.

  • Please just verify that if I say that I take a full week time-off, including saturday and sunday, that I will NOT actually take any vacation or PL during those days. Or rather: This should be a setting: Take PL during red days yes/no. And it should default to NO. It is impossible to take vacation during red days (and saturdays), but you can actually take PL to get more money, but you will of course loose days.

  • The "Public holidays" section in the settings, that's great! But to the right where it says "off", let's make that dynamic so I can click it and it flips (only that day that I click, not the same day the following year) to be a working day.

  • If we have vacation days that are in risk of being lost, then the planner should run to update the kind of days used in the plan to use more vacation days (thus saving PL days).

  • On every event that updates the days off (i.e. the calendar is making some changes), that should trigger the planner to recalculate the best kinds of time-off for all days.