Records D-004 and D-015 to D-025: shells and ownership, server seams
(router middleware, rate_limit layer, tasks::start, AuditWriter and PushQueue
traits, next_occurrence_date in kvitt-domain, M3 owns recurring generation,
M4 lands after M3), OpenAPI parsed-value equality, feature convention and
strings, empty fake scenario and resolveRange exception, shared ledger rows and
editor fields in :core:design, no bundled font, pruning at 04:00, development
infrastructure as M2c-dev built it, M2c-pi allowances, release keystore,
production import procedure. Plans and prompts close their open points;
HANDOFF rewritten to the real state; CLAUDE.md: implementation agents never
edit SPEC.md or docs/decisions.md.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
PLAN-<id>.md for U1, U2, M1, M2a, M2b, M2c-dev, M2c-pi, M3, M4, M5, M6,
M7a-M7f, M8, M9, M10, M11, each with the eleven fixed sections, and a
start prompt per plan in prompts/ plus prompts/README.md (dependency
order and parallel waves).
SPEC v0.2: owner answers D-001 (development-first, M2c split into
M2c-dev and M2c-pi, Gitea registry), D-002 (local backups deleted once
on Drive), D-003 (Splitwise CSV format, English and Swedish variants,
category mapping), OQ-1, OQ-2, OQ-4 answered; M1's readings of
ambiguous contract points stated explicitly in §14.3 to §14.5.
HANDOFF §2 lists the plans.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Write SPEC.md v0.1 from the owner interview (requirements, data model,
stack, API outline, security, business rules, deployment, milestones,
UX sprint brief, contracts). Fill the CLAUDE.md blanks, move the Gradle
pin files into android/, point the tools at android/ and server/, and
record the git bootstrap exception in the handoff.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>