Files
kvitt/prompts
jacobh2 76ee957f41 SPEC v0.3: orchestrator resolutions of the plans' open points
Records D-004 and D-015 to D-025: shells and ownership, server seams
(router middleware, rate_limit layer, tasks::start, AuditWriter and PushQueue
traits, next_occurrence_date in kvitt-domain, M3 owns recurring generation,
M4 lands after M3), OpenAPI parsed-value equality, feature convention and
strings, empty fake scenario and resolveRange exception, shared ledger rows and
editor fields in :core:design, no bundled font, pruning at 04:00, development
infrastructure as M2c-dev built it, M2c-pi allowances, release keystore,
production import procedure. Plans and prompts close their open points;
HANDOFF rewritten to the real state; CLAUDE.md: implementation agents never
edit SPEC.md or docs/decisions.md.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 21:23:38 +02:00
..

Start prompts

One ready-to-paste start prompt per plan (PLAN-<id>.md at the repository root), plus ORCHESTRATOR-prompt.md. Before pasting, the orchestrator fills {{NEXT_DECISION}}, {{SPEC_VERSION}}, {{SCHEMA_VERSION}} (disjoint ranges for agents that run in parallel, CLAUDE.md › Numbering) and {{ORCHESTRATOR_NOTES}} (answers to the plan's open points, phone assignment, overrides). U2.md also takes {{OWNER_PICK_AND_COMMENTS}}. U1 and U2 run in the owner's own Claude session in ~/orca/workspaces/kvitt/UX-sprint on branch UX-sprint. The numbers are for proposed entries in agents' reports: implementation agents never edit SPEC.md or docs/decisions.md; a docs agent records what the orchestrator accepts (CLAUDE.md › Orchestration).

Dependencies follow SPEC §11.1 and §11.2 (v0.3). Status as of 2026-10-17: M0 done, M1 landed (c6df2ab), M2c-dev landed (c885aba); M2a and M2b in flight; U1 in the owner's session. The plans' open points are resolved in SPEC v0.3 and recorded in each plan's §4.

Dependency order and waves

Plans in the same wave can run in parallel (they own disjoint paths, SPEC §14.7). Android agents share one Gradle build at a time (tools/gradle-serial.sh) and one agent on the phone at a time.

Wave Plan Prompt Depends on Parallel with
0 M1 Contracts and vectors M1.md M0 done (c6df2ab)
0 U1 UX directions U1.md M0 everything in waves 0 to 2 (owner's session)
1 M2a Server skeleton and kvitt-domain M2a.md M1 M2b, M2c-dev, U1/U2
1 M2b Android skeleton and :domain M2b.md M1 M2a, M2c-dev, U1/U2
1 M2c-dev Infra for development M2c-dev.md M0 (its health check needs M2a's image) done (c885aba)
1 U2 UX design spec U2.md U1 and the owner's pick M2a, M2b, M2c-dev, wave 2
2 M3 Server core API M3.md M2a M4 (M4 lands after M3), M5, M6
2 M4 Server sync, audit, push, scheduler M4.md M2a; lands after M3 (D-015) M3, M5, M6
2 M5 Android data layer M5.md M1, M2b M3, M4, M6
2 M6 Design system M6.md U2 approved, M2b, the §9.7 colour spec change M3, M4, M5
3 M7a Feature onboarding M7a.md M6 M7b to M7f, M9
3 M7b Feature home and account M7b.md M6 M7a, M7c to M7f, M9
3 M7c Feature expense M7c.md M6 M7a, M7b, M7d to M7f, M9
3 M7d Feature settle M7d.md M6 M7a to M7c, M7e, M7f, M9
3 M7e Feature analytics M7e.md M6 M7a to M7d, M7f, M9
3 M7f Feature settings M7f.md M6 M7a to M7e, M9
3 M9 Splitwise importer M9.md M2a, M4 M5, M6, M7a to M7f
4 M8 App integration M8.md M3, M4, M5, M7a to M7f, M2c-dev M9 if still running
5 M2c-pi Infra on the Pi M2c-pi.md M2c-dev, M8; OQ-3 answered none needed
6 M10 First release M10.md M2c-pi, M3, M4, M8 none
7 M11 Import history M11.md M9, M10 none

Constraints the orchestrator must keep in mind

  • M3 and M4 (D-015): M2a provides next_occurrence_date, the AuditWriter/PushQueue traits with no-op implementations and tasks::start; M3 writes the recurring generation function and calls the traits; M4 replaces the implementations, its scheduler calls M3's function, and M4 lands after M3.
  • M2a and M2b create shell files and modules in later milestones' paths (D-004); ownership passes on when they land.
  • M7a to M7f follow the feature convention of SPEC §6.2 (D-017) and take the ledger rows and expense editor fields from M6's :core:design (D-019).
  • M6 starts only after the §9.7 colour change from U2's proposal has landed in SPEC (§11.1).
  • Phone: M2b (one installDebug), M5 (only if instrumented tests), M8 and M10 use the phone; only one at a time, named in the notes.
  • Outside the repository: M2c-dev (D-022, done), M2c-pi (the Kvitt Pi, the Home Assistant Pi, Gitea, Drive: allowances requested at the start of that sprint, D-023), M8 (dev server on the Mac), M10 and M11 (production) need the owner's allowance in the notes.